Turn Key Building Group Logo
The Farmhouse Hero Image

The Farmhouse

The project included building a 5600-square-foot footprint and a new 700-foot driveway, and moving Hydro One lines from the shoreline. It also included a 3200-square-foot dock extending 200 feet into the water and a steel hangar built over the slips for aircraft parking.

The entire project, from driveway building to final designs to hydro line moving to final occupancy, took nearly a year and a half. The process of building, from the time that permits were issued until clients were sleeping in the beds, was 10 months. This included having all features on the property completed, including dock, hangar, pool, and landscaping.